LineTime.org : Guemes Island Ferry Committee
Notes, Guemes Island
Ferry Committee
Guemes Island Ferry
Committee / Skagit County Public Works
Roundtable
Meeting of Friday, April 15, 2005
Meeting Commenced:
2:00 PM
Roundtable Members
Present:
GIFC—Cady, Veal, Fosbre, Garcia, Orsini
PW--- Flude, Cox
Crew—Panzero
Additional Attendees:
Win Anderson, Gary Davis
Agenda:
Ferry Facilities—1)
Fall outage date,: 2) Passenger ferry options during outage; 3) ADA
accessibility ; 4) ADA ferry modifications proposed
Parking Lots ---
1) Guemes implementation schedule and community input; 2) immediate
interim usage possibilities; 3) Anacortes lot time-line; 4) Anacortes
terminal time-line
Operations---
1) process to operate with 3 person crew; 2) Ticketing
Operations
Costs--- 1) GIFC contact for accounting questions; 2) out-drive repair
review; 3) Emergency ferry outage notification procedures; 4) county
policy concerning stranded vehicles, transport and reimbursement.
Discussion:
The guests were
asked by Flude if there were any public comment and there was none.
Fall outage date
work and surrounding concerns.
Veal
reiterated the desire of the GIFC, as stated in the last Roundtable
meeting, to schedule the outage in September if at all possible. This
would be the best time for weather considerations and the best to accommodated
previously established islander plans.
Cox said that
the “bid packages” for the engine replacements won’t
go out until next week, with a response date of the first week in
May, two weeks to select the bidder and 16 weeks for delivery (This
makes delivery by September 9th 2005). Cox stated that the outage
would need to be in October but will review this as the process proceeds.
Following a question,
Cox stated that the list of work for the outage would be available
in early June. Work known at this time is: 1) painting the vessel.
2) replacement of both engines, 3) repair of the Anacortes bridge
joint, 4) making the passenger cabin accessible for a wheel chair,
5) relocation of the passenger walkway to the west side of the Guemes
dock.
Wheel chair access
discussion—Cox provided a look at the proposed cabin layout
and said that this would require permanent removal of some of the
passenger seating for reasons surrounding the mechanics of a movable
bench. The FC requested that further consideration be given to making
the seating area available for passengers when not used by a wheel
chair occupant. Cox agreed to do that. The FC requested an opportunity
to further review the ADA plans and loading procedures.
Beach landings
during the outage vs. dock landings at the Anacortes terminal. The
Anacortes bridge work will require the bridge to be disabled and lifted
above the dock level. Cox again stated that this would require beach
landings. The GIFC again requested and reviewed the strategy of placing
a floating dock or barge close to the dock with a long brow extending
to the terminal area, landward of the movable bridge. Cox said he
would contact Culbertson Marine to see what might be possible. Cox
said that van service would again be provided on Guemes and that if
beach landings were required that a light movable aluminum bridge
with hand rail would be provided to access the beach.
The
GIFC requested that the newly purchased property on Guemes be made available
on a temporary basis prior to final development. There is a need now
for more parking, particularly if we want to encourage walk-on passengers
during the summer. Cox stated that county code requires that if more
that 5,000 sq ft of gravel surface are laid (considered an impervious
surface), that drainage and run off containment must be provided. He
agreed to review possible interim drainage options to make the parking
area available.
The scheduled
work for the new Anacortes parking area is to start May 1st and be
completed by May 23rd. Garcia requested that the county work with
the City of Anacortes to relax the street parking regulations during
the construction period due to the loss of parking space. Cox said
that he would contact the city but that they are becoming less and
less tolerant of the parking problem. In response to the status of
egress from the new lot through the railroad grade parking lot, Flude
said that the two attorneys were still negotiation the easement language
with the Marina.
24 hour parking
limit-Guemes lot--- the GIFC said that we support the removal of derelict
vehicles from the parking lot but that the 24 hour limit was inappropriate
and impractical to enforce. Cox said that following our earlier request
that he had posted the only parking time limit permitted in the county
code and one that the County Sheriff could act upon. The GIFC recommended
that a 7-10 day period would be more reasonable but that additional
island views should be sought. Cox agreed to investigate other possibilities
and report back.
Three person
Crew operation
Cox stated that
while the county is still committed to return to three person operation
that many things are getting in the way of accomplishing this: 1)
many days ferry usage is to high 2) the Coast Guard requirement that
the crew not go beyond the terminal building to pre-sell tickets,
3) the county cash handling requirements. Panzero (crew) said that
while he previously supported three person operation that the following
were causing problems: 1) the number of oversized vehicle sales, 2)
the loss crew and retraining time for new crew members, 3) contractual
requirements, 4) crew breaks.
Cady said that
the GIFC did not want any involvement in the management of the ferry
operation but at the same time was requesting that the county review
all elements of the ticketing , loading and operating procedures and
develop methods that would assure three person crew operation during
normal situations. He also said that the rider-ship data supplied
by the county did not support an increase in oversize vehicle sales
since 1996. Orsini expressed the view that the operations problems
were caused by the counties inability to correct their ticket sales
and cash handling processes. Further, that as far as the rider-ship
was concerned, the county could man the vessel with 10 people per
shift but the rider-ship revenue requirement should only reflect a
three person crew, until the county fixed their internal problems.
The lack
of a second 9:00 AM ferry Monday-Thursday.
It was offered
by Cady that a second run of the 9:00 AM ferry could be accomplished
if it were moved to 9:05 AM permitting the scheduled crew break at
8:45 AM. This was a solution that Panzero was also about to offer
but also wanted to move the 3:10 PM to 3:15 PM to better accommodate
the crew break in the PM. Much discussion followed as to how this
could be accomplished, published to the rider-ship etc. Panzero agreed
that this change in the schedule would also improve the ability to
operate with a three person crew. Flude agreed to start the new schedule
on Monday April 17th with appropriated rider-ship notification. The
GIFC agreed to post it on Linetime and on the chalk board at the Guemes
terminal.
10:00 AM Tuesday
Propane Run – the GIFC requested that the county follow up with
the task force recommendation that the Propane suppliers come to Guemes
on the 6:30 AM ferry. This would help with traffic load on Tuesdays.
Cox will pursue this with the suppliers.
Current
ferry engine and out-drive condition status— in response
to a question, Cox stated that # 2 engine had been replaced with a new
engine while the ferry was in dry-dock and was being operated at lower
RPM during the break-in period. Also, continued monitoring of the repaired
out-drive showed that the repair was successful. The overhaul of the
spare out-drive, after looking all over the US and Canada for parts,
is scheduled to be complete in 10 weeks. The first promise by Roles
Royce of Canada was 30 Weeks. The County is pursuing the Canadian repair
shop for faulty repair work, which Cox said resulted in the out-drive
failure.
Ferry operation
Costs--- Flude passed out a
spread sheet of the last 5 years of costs and revenues
that PW is planning to present to the commissioners at next Tuesdays’
meeting. Wages and Benefits are up $266,000 (33%), Other services and
Charges are up $385,000 (600%), special project cost in 2005 were $1,462,000
plus $367,000 for land acquisition (future Guemes parking lot), Fares
revenue was up $68,000 (17%). There
was no time for discussion.
The next meeting
needs to be scheduled
Guemes Island Ferry
Committee
Meeting Adjourned:
4:20PM
|
|